10 Essential Evaluation Criteria for Commercial Design-Build RFPs in India

A practical guide for evaluating design-build firms beyond proposal narratives. Covers delivery system assessment, integration capability, design management discipline, commercial transparency, governance and controls, and local execution depth. Includes evaluation checklist and common red flags to watch for during selection.

X (Formerly Twitter)LinkedIn

Once your RFP is issued and proposals are received, a systematic evaluation determines project success. This guide provides the ten essential criteria for scoring design-build proposals, with practical matrices and frameworks to ensure objective, defensible selection decisions.

Whether you’re establishing a Global Capability Center or expanding your commercial footprint, these evaluation benchmarks will help you select the right partner and maximize project outcomes.

Vestian’s Approach to Commercial Design-Build RFP Evaluation

Effective CRE RFP evaluation in India requires more than a checklist—it demands an integrated, client-centric methodology that aligns real estate decisions with broader business strategies.

Vestian brings a unique combination of global best practices and local market insight to every RFP evaluation. As a tenant-only commercial real estate firm with deep expertise in commercial interior design across India’s major markets, Vestian partners with clients to ensure evaluations result in successful, compliant, and future-ready projects.

What distinguishes Vestian’s strategic real estate procurement approach:
  • Collaborative stakeholder engagement that captures diverse requirements
  • Customized scoring matrices tailored to project-specific priorities
  • Focus on sustainable, long-term value rather than lowest-cost selection
  • End-to-end in-house capabilities, including design teams, construction workforce, and proprietary technology
  • Deep understanding of regulatory landscapes across Indian states

1. Project Experience and Track Record

Why it matters:

A bidder’s demonstrated history of completing similar projects is the strongest predictor of future performance and the most effective way to minimize execution risk.

When evaluating commercial design-build proposals, prioritize bidders who can verify past projects of comparable type, scale, and complexity. This is often a minimum qualification requirement for RFPs in India.

Verification tools to request:
  • Detailed project portfolios with photographs and specifications
  • Client references with contact information
  • Documented outcomes, including completion timelines and budget adherence
  • Third-party performance assessments, where available
Sample Project Comparison Matrix:
Criteria Bidder A Bidder B Bidder C
Similar project size (sq. ft.) 150,000 120,000 200,000
Sector experience Technology Financial Services Mixed
Projects completed (last 5 years) 12 8 15
Average delivery timeline variance +3% +8% +2%
Client references provided 5 3 6

Vestian’s portfolio includes successful financial services workplace design-build projects and workspace transformations for global financial leaders, demonstrating consistent delivery across complex commercial requirements.

2. Qualifications and Competence of the Project Team

Why it matters:

A highly skilled, fully resourced team is frequently the deciding factor for project success—more so than organizational reputation alone.

Proposal submissions should include detailed resumes for key personnel—project managers, lead architects, structural engineers, MEP consultants—along with verification of sector-specific certifications.

Critical evaluation points:
  • Confirm key experts’ availability for the project duration
  • Require justification for any proposed substitutions
  • Verify professional registrations and certifications
  • Assess experience with similar building typologies
Team Qualification Checklist:
Role Required Qualification Experience Minimum Availability Confirmed
Project Manager PMP/PRINCE2 10+ years
Lead Architect COA Registration 8+ years
Structural Engineer PE/SE License 8+ years
MEP Lead Relevant certification 7+ years
Site Supervisor Diploma minimum 5+ years

Note that substitutions of key experts without adequate justification may lead to proposal disqualification under standard Indian RFP protocols.

3. Quality and Innovation in the Technical Proposal

Why it matters:

Technical proposals reveal a bidder’s true understanding of project requirements and their capacity for creative problem-solving.

Evaluate proposals for evidence of innovation across design concepts, engineering solutions, sustainable materials, and construction technologies. The strongest proposals demonstrate a clear understanding of objectives, deliverables, and performance metrics.

Elements to assess:
  • Clarity and specificity of design concepts
  • Problem-solving approach to identified challenges
  • Integration of sustainable materials and technologies
  • Understanding of local construction conditions
  • Firm size, employee distribution, and joint venture arrangements (if applicable)

When designing innovation hubs for technology companies, technical proposals should reflect sector-specific requirements, such as collaborative spaces, advanced infrastructure, and scalability provisions.

Technical Proposal Scoring Framework:
Element Weight Score (1-10) Weighted Score
Design concept alignment 25%
Methodology clarity 20%
Innovation elements 15%
Resource allocation 15%
Risk mitigation approach 15%
Sustainability integration 10%

4. Cost Estimates and Financial Stability

Why it matters:

Transparent pricing and demonstrated financial strength protect clients from mid-project disruptions and hidden cost escalations.

Require bidders to present detailed line-item cost estimates alongside financial statements proving solvency. The most credible proposals include value-engineering options- cost-saving proposals that maintain or enhance quality.

Financial evaluation requirements:
  • Line-item cost breakdown by project phase
  • Audited financial statements (minimum 3 years)
  • Bank solvency certificates
  • Details of current project commitments
  • Value engineering alternatives with savings quantification
Cost Proposal Analysis Matrix:
Cost Element Bidder A Bidder B Bidder C Notes
Direct construction costs Compare like-for-like
Preliminaries & general conditions % of direct costs
Design fees Scope included
Allowances Scope definitions
Contingency % and drawdown rules
Total proposed price
Two-Stage Price Proposal Process (Common in India):
  1. Stage 1: Technical evaluation and shortlisting based on qualifications and methodology
  2. Stage 2: Opening of sealed financial proposals only for technically qualified bidders

This approach ensures financial considerations don’t overshadow technical competence during initial evaluation.

5. Understanding and Interpretation of RFP Documents

Why it matters:

Proper comprehension of RFP documents signals a bidder’s diligence, professionalism, and likelihood of smooth project execution.

RFP documents include all addenda, attachments, and detailed terms governing the project. Evaluators should check for clear articulation of ambiguities, questions, or clarifications offered before the submission deadline.

Evaluation Checklist:
Item Bidder A Bidder B Bidder C
All addenda acknowledged
Submission format compliant
All mandatory sections addressed
Contract terms acknowledged
Clarification questions submitted
Assumptions clearly documented

Bidders who submit thoughtful clarification questions typically demonstrate deeper engagement with project requirements.

6. Proposed Project Delivery Methodology

Why it matters:

A delivery model tailored to client needs is crucial for predictability, efficiency, and stakeholder alignment throughout project execution.

Design-Build projects in India have demonstrated significant advantages: 20% faster completion and 15% cost reduction compared to traditional design-bid-build methods. However, success depends on selecting a methodology aligned with your specific requirements.

Methodology Assessment Criteria:
  • Alignment with the desired project schedule
  • Support for budget ceilings (including Guaranteed Maximum Price options)
  • Stakeholder collaboration mechanisms
  • Change order management procedures
  • Quality assurance protocols
Project Delivery Model Comparison:
Factor Design-Build Design-Bid-Build Construction Management
Single point of responsibility Varies
Speed to completion Fastest Slowest Moderate
Cost certainty High Moderate Varies
Design flexibility Moderate High High
Owner involvement Moderate High High
Risk transfer High Low Shared

For organizations establishing Global Capability Centers in India, design-build delivery often provides the speed and accountability essential for aggressive expansion timelines.

7. Compliance with Regulatory and Legal Requirements

Why it matters:

Meeting statutory and contractual mandates is non-negotiable—failures here can halt projects, trigger penalties, and create long-term liabilities.

Evaluate bidders for up-to-date registrations, licenses, and demonstrated adherence to local, state, and national building codes.

Compliance Documentation Checklist:
Requirement Document Required Bidder A Bidder B Bidder C
Company registration Certificate of Incorporation
GST registration GST Certificate
Professional licenses Architect/Engineer registrations
Labor compliance PF/ESI registrations
Safety certifications ISO/OHSAS certificates
No blacklisting Self-declaration + verification
No pending litigation Legal declaration
Conflict of interest Disclosure statement
Eligibility exclusions to verify:
  • Bidder is not blacklisted by any government agency
  • No involvement in legal disputes related to similar projects
  • Full declaration of any conflicts of interest
  • No debarment from public or private sector contracts

8. Commitment to Sustainability and Green Building Practices

Why it matters:

Sustainability credentials increasingly distinguish leading bidders and align projects with evolving regulatory requirements and corporate mandates.

Indian commercial developments increasingly require robust environmental responsibility commitments. Evaluate bidders for certifications, documented practices, and measurable sustainability targets.

Sustainability credentials to assess:
  • LEED (Leadership in Energy and Environmental Design) ratings
  • IGBC (Indian Green Building Council) certifications
  • GRIHA (Green Rating for Integrated Habitat Assessment) compliance
  • Energy efficiency documentation and targets
  • Water conservation strategies
  • Sustainable material sourcing policies
  • Waste management and recycling programs
Bidder Sustainability Comparison Matrix:
Initiative Bidder A Bidder B Bidder C
Green building certification LEED Gold IGBC Platinum None
Energy efficiency target 30% reduction 25% reduction 15% reduction
Renewable energy integration Solar + HVAC Solar only None
Water recycling commitment 100% 75% 50%
Sustainable materials pledge Yes Partial No

Vestian’s approach to commercial interior design in Delhi NCR and other markets integrates sustainability as a core principle rather than an afterthought.

9. Realistic and Detailed Project Timeline

Why it matters:

An actionable, milestone-driven timeline reduces delays, supports stakeholder confidence, and enables meaningful progress tracking.

Require schedules with defined deliverables, deadlines, and critical path analysis. Timelines should be consistent with the proposed technical approach and available resources.

Timeline Evaluation Criteria:
  • Clear phase demarcations (design, procurement, construction, commissioning)
  • Identified milestones with specific dates
  • Critical path activities highlighted
  • Float/buffer allowances for risk mitigation
  • Resource loading aligned with activities
  • Dependencies clearly mapped
Sample Milestone Comparison:
Phase Industry Standard Bidder A Bidder B Bidder C
Design development 8-10 weeks 8 weeks 12 weeks 7 weeks
Regulatory approvals 4-6 weeks 5 weeks 4 weeks 6 weeks
Procurement 6-8 weeks 7 weeks 8 weeks 5 weeks
Construction 16-20 weeks 18 weeks 22 weeks 15 weeks
Testing & commissioning 2-4 weeks 3 weeks 4 weeks 2 weeks
Total Duration 36-48 weeks 41 weeks 50 weeks 35 weeks

Be cautious of timelines significantly shorter than industry standards without clear justification—aggressive schedules may indicate unrealistic planning or hidden assumptions.

10. Post-Construction Support and Maintenance Services

Why it matters:

Ongoing support commitments ensure operational success and asset protection long after project handover.

Evaluate warranties, preventive maintenance programs, and response times for post-construction issues. The best partners view handover as the beginning of a relationship rather than its conclusion.

Post-Construction Support Evaluation Matrix:
Service Element Bidder A Bidder B Bidder C
Structural warranty 10 years 10 years 5 years
MEP warranty 2 years 1 year 2 years
Defect liability period 24 months 12 months 18 months
Response time (critical) 4 hours 24 hours 8 hours
Preventive maintenance Included (1 year) Optional Not offered
Training for facilities team Comprehensive Basic None
Documentation handover Digital + Physical Physical only Digital only

Organizations establishing US-inspired workspaces in India should ensure post-construction support aligns with global operational standards.

Master Evaluation Framework

Apply a weighted scoring approach that reflects your organization’s priorities. Adjust weights based on project-specific requirements.

Criteria Suggested Weight Your Weight Score (1-10) Weighted Score
Project experience & track record 15%
Team qualifications 10%
Technical proposal quality 15%
Cost & financial stability 20%
RFP comprehension 5%
Delivery methodology 10%
Regulatory compliance 5%
Sustainability commitment 5%
Project timeline 10%
Post-construction support 5%
Total 100%
Scoring Rubric:
Score Meaning
9-10 Exceptional – Exceeds requirements, best-in-class
7-8 Strong – Fully meets requirements with notable strengths
5-6 Acceptable – Meets minimum requirements
3-4 Weak – Partially meets requirements, concerns noted
1-2 Inadequate – Does not meet requirements

Frequently Asked Questions

What is a design-build RFP in commercial real estate?

A design-build RFP is a formal solicitation document used to select a single contractor responsible for both design and construction of a commercial project. Unlike traditional design-bid-build methods, where these are separate contracts, design-build integrates the entire project lifecycle under one partner, typically delivering 20% faster completion and 15% cost reduction.

What are the most important criteria for evaluating design-build proposals?

The ten essential criteria are: project experience and track record, team qualifications, technical proposal quality, cost estimates and financial stability, RFP comprehension, delivery methodology, regulatory compliance, sustainability commitment, project timeline, and post-construction support. Cost and financial stability typically carry the highest weight at around 20%.

How do you verify a contractor's experience and track record?

Request detailed project portfolios with photographs, client references with contact information, documented outcomes including timeline and budget adherence, and third-party performance assessments. Create a comparison matrix evaluating similar project size, sector experience, projects completed in the last five years, and delivery variance.

What is a two-stage price proposal process?

This process separates technical and financial evaluation to ensure cost doesn't overshadow capability. Stage 1 evaluates and shortlists proposals based on qualifications and methodology, while financial proposals remain sealed. Stage 2 opens financial proposals only for technically qualified bidders.

What regulatory compliance documents are required for bidders in India?

Required documentation includes Certificate of Incorporation, GST Certificate, professional architect and engineer registrations, PF/ESI labor compliance registrations, and ISO/OHSAS safety certifications. Bidders must also provide declarations confirming no blacklisting, no pending litigation, and no conflicts of interest.

What sustainability certifications matter for design-build contractors in India?

Key certifications include LEED ratings, IGBC (Indian Green Building Council) certifications, and GRIHA compliance. Beyond certifications, evaluate energy efficiency targets, water conservation strategies, sustainable material sourcing policies, and waste management programs.

How do you evaluate whether a project timeline is realistic?

Compare proposed timelines against industry standards and look for clear phase demarcations, identified milestones with specific dates, critical path analysis, and appropriate buffer allowances. Be cautious of schedules significantly shorter than benchmarks without clear justification—aggressive timelines may indicate unrealistic planning.

What post-construction support should design-build contracts include?

Comprehensive support includes structural warranties (typically 10 years), MEP warranties (1-2 years), defect liability periods (12-24 months), defined response times for critical issues, preventive maintenance programs, facilities team training, and complete documentation handover.

What is the difference between design-build and design-bid-build?

Design-build provides single-point responsibility with one contractor handling both design and construction, offering faster completion and higher cost certainty. Design-bid-build separates these into different contracts, providing more design flexibility but slower completion and less cost predictability.

Partner with Vestian for Strategic Design-Build Success

Navigating commercial design-build RFPs in India requires expertise that spans real estate strategy, technical evaluation, and local market dynamics. As top tenant representation specialists for GCCs in India, Vestian brings the integrated perspective necessary to transform RFP evaluation from a procurement exercise into a strategic advantage.

Whether you’re expanding operations, rebuilding workforce strategy through Global Capability Centers, or optimizing existing facilities, Vestian’s end-to-end capabilities ensure your design-build partner selection aligns with long-term business objectives.

Connect with Vestian to discuss how our approach to CRE RFP evaluation in India can support your next commercial project.

This guide reflects current best practices for commercial design-build RFP evaluation in India. Specific requirements may vary by project type, location, and regulatory jurisdiction.