A leading food manufacturing company appointed Vestian to design and deliver a 63,000 sq. ft. workplace in Bengaluru. Envisioned as more than aconventional corporate office, the brief was to create a people-centricenvironment that reflected the organisation’s identity while responding toevolving ways of working, collaborating, learning and connecting.
Vestian translated this vision into a workplace where brand, experience andfunctionality come together as part of the everyday environment. The designbrings focused work, collaboration, learning and social interaction into acohesive setting, supported by flexible planning and employee-focused spaces.Brand expression is integrated throughout the workplace, while biophilicelements, daylight optimisation, low-emission materials and adaptable furnitureembed well-being and sustainability into the overall design approach.
It is a contemporary workplace shaped around its people, with a distinct identity andthe flexibility to support changing workplace needs.
Challenge
The project involved multiple interdependent execution challenges, requiring close coordination across design, procurement, vendors and site activities. Delays in specialized equipment and material deliveries affected the sequencing of ceiling and fit-out works, while evolving client requirements led touncertainty around certain areas of the scope. Site constraints, including limited ventilation and operational restrictions, added complexity tomaintaining suitable working conditions. Ongoing design modifications andpending vendor finalisations further required continuous alignment acrossconsultants and execution teams to maintain project momentum.
Solution
Vestian adopted a flexible execution strategy to manage interdependent procurement, design and site constraints while maintaining project momentum. Activities were carefully sequenced around material and equipment dependencies, allowing unaffected work fronts to progress alongside critical deliveries and decisions. Ventilation and site-operation constraints were addressed through alternative measures to maintain safe working conditions, while regular vendor coordination and stakeholder reviews enabled timely resolution of evolving requirements and design changes.
This structured approach helped minimize disruption and maintain progress across parallel workstreams. The workplace was delivered within 443 days, recording 49,540safe man-hours with zero accidents and zero lost-time incidents. The resultis a contemporary workplace shaped around its people, with a distinct identityand the flexibility to evolve with changing workplace needs.
Key Services
Project Management
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.