Case Studies

Delivering Service Intensive Sepcialized Laboratories Within One Integrated R&D Facility

Services
No items found.
solutions
No items found.
Location
Hyderabad

Overview

A global medical technology leader partnered with Vestian as its Integrated Service Delivery Partner to develop a highly specialized 106,000 sq. ft. facility in Hyderabad. Designed to accommodate approximately 440 employees, the facility brings together advanced research, testing, prototyping, and supporting workplace environments within a single integrated setting.

At the heart of the facility are 11 specialized laboratories, Cybersecurity, Einstein, Wet, Mechanical Testing, Software Testing, 3D Prototyping, Vent, Lathe Machine, Navigation, RTG-Spine O-arm and CVG—supporting activities ranging from medical instrument and ventilator testing to software development, cybersecurity, mechanical testing, prototyping and equipment evaluation. Each laboratory required specialized infrastructure, controlled environments and carefully coordinated engineering systems to meet its distinct operational requirements.

‍

106K
Square Foot Workspace
11
Service-Intensive Laboratories
120 Days
Delivery Time

Challenge

The 11 laboratories presented highly specialized operational, safety and environmental requirements, making a one-size-fits-all approach impractical. Requirements ranged from ESD-controlled environments and radiation protection to dedicated medical gas systems, specialized ceiling heights and secure infrastructure. Integrating these diverse needs within a common facility required close coordination across electrical, mechanical, medical gas, data and safety systems, while maintaining the performance and integrity of each laboratory.

Solution

Vestian developed a coordinated engineering strategy tailored to the requirements of each laboratory. ESD controls, radiation shielding, dedicated oxygen and compressed-air systems, controlled environments and independent infrastructure were integrated where required, while maintaining a consistent approach to the wider facility.

The various building services were carefully coordinated to work as one integrated system, with standardized lighting supporting consistent working conditions. This approach enabled highly specialized laboratories to function within a cohesive, efficient and high-performance research environment.

Key Services

No items found.
Success Stories
No items found.